Estimating support for contractors
What changed in the bid?
Follow an issued drawing through the review model, measured quantities and BOQ. When a revision arrives, see which lines to reprice and which still need an answer.

From the revision register
One corrected outline added 0.872 m³ of concrete.
We matched the change to the slab BOQ and traced its effect on net reinforcement mesh. The estimate awaits the applicable rates.
- Matched concrete elements
- 377
- Measured BOQ lines changed
- 3
- BOQ lines held
- 10
From drawing issue to estimate revision
Read the issue
Identify the governing drawing, units, revision and measurement limits. Log any missing dimension against the affected item and ask the issuer for clarification.
Build the review model
Represent the measurable geometry in CAD and IFC. Use Navisworks to inspect the model and its item properties. Native Revit 2024 delivery is planned after an authored RVT and its schedules are checked.
Measure the BOQ
Match element marks to quantity lines. Keep concrete volume, net mesh and purchasing allowances on their own measurement bases.
Apply agreed rates
Record the rate, date, unit and inclusions for each priced line. A missing rate leaves the commercial value open.
Reconcile the revision
Match both issues by item. Trace changes to the priced workbook, distinguish quantity movement from rate movement, and report held lines separately.
Project studies
Have a PDF to measure?
Check which scale, unit, level and revision notes can be read from its text. The file stays in your browser.
Open the drawing note check →