What changed in the bid?

Follow an issued drawing through the review model, measured quantities and BOQ. When a revision arrives, see which lines to reprice and which still need an answer.

Foundation review model with the slabs hidden to expose footings and tie beams
Foundation revision study Navisworks model view

From the revision register

One corrected outline added 0.872 m³ of concrete.

We matched the change to the slab BOQ and traced its effect on net reinforcement mesh. The estimate awaits the applicable rates.

Matched concrete elements
377
Measured BOQ lines changed
3
BOQ lines held
10

From drawing issue to estimate revision

  1. Read the issue

    Identify the governing drawing, units, revision and measurement limits. Log any missing dimension against the affected item and ask the issuer for clarification.

  2. Build the review model

    Represent the measurable geometry in CAD and IFC. Use Navisworks to inspect the model and its item properties. Native Revit 2024 delivery is planned after an authored RVT and its schedules are checked.

  3. Measure the BOQ

    Match element marks to quantity lines. Keep concrete volume, net mesh and purchasing allowances on their own measurement bases.

  4. Apply agreed rates

    Record the rate, date, unit and inclusions for each priced line. A missing rate leaves the commercial value open.

  5. Reconcile the revision

    Match both issues by item. Trace changes to the priced workbook, distinguish quantity movement from rate movement, and report held lines separately.