PUBLIC CASE STUDY
Civic building study
Structural and architectural coordination presented through clean model views and selected quantity examples.

Model walkthrough
18-second silent tour: overview, structural frame and foundations. Amber distinguishes provisional geometry; camera changes illustrate model views.
The workflow
Read the drawings
Use structural and architectural PDFs with relevant CAD cross-checks.
Separate the disciplines
Prepare structural and architectural models on a common review basis.
Coordinate the views
Review the combined building while retaining discipline-specific deliverables.
Present the quantities
Connect selected model categories with an unpriced BOQ.
A real quantity example
| Element | Unit | Quantity |
|---|---|---|
| Blinding concrete | m³ | 392.990 |
| Footings | m³ | 1,133.043 |
| Tie beams | m³ | 86.184 |
| Ground-floor columns | m³ | 381.501 |
| Ground-floor core walls | m³ | 184.618 |
Selected review quantities from the combined BOQ workbook, review 05. This excerpt covers foundation and ground-floor vertical elements, not the full project total. Presentation excerpt with original numeric values and simplified descriptions. Unpriced review quantities.
Professional presentation
Selected project information is presented in an anonymized format for professional demonstration. Project-specific documentation is shared only under agreed confidentiality arrangements.
Selected coordination and quantity-review outputs. Not a construction issue.